If you’ve ever stood near a running air separation unit (ASU) – whether at a metal fabrication plant, pharmaceutical lab, or industrial gas storage facility – you know these systems work like giant, precision cold-breathing machines, pulling oxygen, nitrogen, and argon straight from the air. But here’s what many operators don’t talk about: ASUs aren’t just complex; they’re inherently high-risk. I’ve seen it firsthand over 12 years as an ASU supplier: a single overlooked valve, a miscalibrated pressure gauge, or a skipped daily equipment check can spiral into a leak, pressure surge, or even a fire that shuts down production for weeks – or worse, injures someone. Type Of Air Separation Unit

At our company, we don’t just sell ASUs; we design them to be safe, and we don’t abandon our clients the minute the unit leaves the loading dock. Over the years, we’ve compiled the lessons from the operators we work with – the ones who’ve been in the trenches, fixed a night shift emergency, and survived a near-miss. This post isn’t just a list of rules; it’s the real-world playbook for operating any ASU safely, from the first startup to routine shutdowns.
First, let’s get one thing straight: safety can’t be an afterthought. It’s baked into every step, and it starts before you even turn the power on. New operators often skip pre-startup checks because they’re eager to get the unit running – but that’s where most ASU incidents begin. Let’s break down the non-negotiables here.
Before any startup, you need to run a full system integrity check. That means not just walking the floor once, but verifying three core areas: piping, pressure relief valves (PRVs), and inert gas purge systems. Piping is the unsung weak point here. ASUs operate at extremely low temperatures (down to -196°C for liquid nitrogen and -183°C for liquid oxygen) and high pressures (up to 100 bar in the air compression stage). Even a tiny 2mm crack in a pipe, undetectable to the naked eye, can turn into a catastrophic leak when nitrogen expands rapidly at low temps, displacing oxygen and creating an oxygen-deficient space that can kill in minutes. We’ve seen clients skip ultrasonic pipe thickness testing before startup and end up with a rupture that closed their plant for 6 weeks – not a cost anyone wants to absorb.
Then there are PRVs. These are the unit’s last line of defense against overpressure. Every single PRV on your compressor, distillation column, and liquid storage tank needs a functional test before startup. I once had a client who thought their PRV was fine because it looked unbroken – but it had rusted shut from a neglected monthly maintenance check. When the compressor overpressurized during startup, the vessel failed, sending metal shrapnel across the plant. Never skip PRV testing, and always log the results; our service team offers free PRV calibration checks for our clients, but we still have to remind some to use it.
Finally, don’t sleep on inert gas purges. Before introducing air into any part of the ASU that holds liquid oxygen, you need to purge with nitrogen or argon to reduce oxygen concentration to below 10% by volume. Liquid oxygen is highly reactive – even a small amount of oil, rust, or plastic dust in the column can ignite violently in a pure oxygen environment. A few years back, a mid-sized manufacturing plant tried to skip purging a new distillation column and loaded it with liquid oxygen, only to have a piece of welding debris left inside ignite and blow a hole in the side. The fire took 3 days to put out, and the plant was out of commission for two months. Purge slowly, test the oxygen level with a calibrated gas detector, and don’t rely on guesswork.
Once you’re past startup, the daily operation routine is where consistency matters most. Operators who cut corners here are the ones who end up in safety training or worse. Let’s cover the daily checks that no ASU operator should skip.
First, monitor the cold box’s temperature and pressure in real time. The cold box is the insulated, sealed enclosure that holds the distillation columns and cryogenic piping – it’s ASU’s heart, and a breach here is a crisis. Operators should log temperature readings every 2 hours for the first 72 hours after startup, then every 4 hours after that, with a mandatory check during night shifts when fewer people are on-site. A sudden drop in cold box pressure usually means a leak; a sudden spike could mean ice buildup in the piping, which can block lines and cause overpressure. We once had an operator who slept through a night shift and missed a pressure spike, leading to a pipe blockage that destroyed a $120,000 condenser – avoid that by setting real-time alarm thresholds on your control system for deviations outside 5% of normal operating levels.
Next, liquid storage tank management is non-negotiable, especially for liquid oxygen and nitrogen. These tanks are insulated, but they still experience boil-off – natural evaporation that increases tank pressure. Every shift, operators should check the tank’s pressure gauge and level indicator, and vent excess pressure gradually through the proper relief valve – never manually vent from the tank’s main outlet, which can cause a rapid pressure drop that leads to liquid splashing, frostbite, or pipe freezing. Also, never store liquid oxygen too close to flammable materials; OSHA requires a 10-meter clearance, but we recommend a 15-meter buffer, and no smoking or welding within 50 meters of any oxygen storage area. One of our older clients had a near-miss when a welder ignored the clearance rule and sparked a fire near a liquid oxygen tank – the tank’s PRV opened and released oxygen, feeding the fire until the team could move the tank to a safe area. It’s not worth risking lives or millions in downtime for 10 meters of space.
Then there’s operator training. Too often, companies assign new operators to ASU duties with only a one-day training session. ASUs require specialized knowledge of cryogenics, pressure systems, and hazard response. We require every operator who runs our units to complete a 40-hour hands-on training program, including a simulation of a leak, fire, and pressure surge, before they’re allowed to work alone. That program covers the basics: how to lock out/tag out (LOTO) equipment during maintenance, how to use self-contained breathing apparatus (SCBA) for oxygen-deficient spaces, and how to respond to a cryogenic burn. LOTO is a big one – 20% of ASU maintenance incidents happen because workers start work on equipment that’s still energized. Always follow LOTO procedures, and don’t let anyone pressure you to skip a step because of a tight deadline.
Maintenance is the silent work that keeps ASUs safe, and it’s something that’s easy to delay when production is high. But deferred maintenance is a safety ticking time bomb. Let’s break down the maintenance that’s critical, not just recommended.
First, routine cleaning of air filters and compressor intakes. ASUs pull air from the atmosphere, which is full of dust, oil, and moisture. If filters are clogged, the compressor has to work harder, leading to overheating and higher pressure that can damage piping. Also, moisture in the air can freeze in the expansion valves, leading to blockages that cause pressure surges. We recommend replacing air filters every 3 months, and having a professional inspect compressor internings every 12 months. We had a client who ran their filters for 6 months without changing them, leading to a compressor overheating that melted a rubber seal, releasing oil into the oxygen line and causing a small fire that shut down the unit for a week.
Second, regular inspection of cryogenic piping. Cryogenic pipes expand and contract with temperature changes, leading to wear on joints and flanges. Every 12 months, you should inspect every flange bolt, gasket, and weld for signs of leakage, rust, or wear. We recommend using a cryogenic leak detector – not just soap bubbles, which can freeze at low temperatures and hide small leaks. Soap bubbles work for high-pressure lines, but for cold-box piping, use a portable infrared gas detector to find leaks before they turn into crises.
Third, calibration of safety equipment. PRVs, gas detectors, pressure gauges, and SCBA need to be calibrated every 6 months. A mis calibrated oxygen detector can fail to alert you to a dangerous leak, while a mis calibrated PRV can fail to open during an overpressure event. We offer annual calibration services for all the safety equipment on our ASUs, but we’ve noticed some companies cut corners here. Last year, a client’s oxygen detector was off by 4% – when a leak happened, the detector read 8% (safe) instead of 12% (hazardous), and two workers were treated for oxygen deprivation. Calibration isn’t a waste of money; it’s a way to avoid medical bills and fines.
Finally, emergency preparedness. Even with all the checks and maintenance, incidents can still happen. You need a clear emergency response plan that every operator knows, and drills every 6 months.
First, know your evacuation routes and emergency assembly points. ASU facilities have at least two evacuation routes, one upwind and one downwind of the cold box and storage tanks. Make sure everyone knows which is which – in the event of a nitrogen leak, you need to move upwind to avoid being overcome by oxygen deficiency. Also, have a dedicated first-aid station near the facility with cryogenic burn kits – these kits contain specialized dressings for frostbite, which is different from regular burns – and a supply of SCBA for workers responding to leaks.
Second, have a clear incident response protocol. If a small leak is detected, the first step is to shut down the affected area, alert the control room, and don personal protective equipment (PPE) before investigating. If a large leak or fire occurs, the protocol is: evacuate immediately, call emergency services, and don’t attempt to fight the fire yourself. Liquid oxygen fires are extremely hot and hard to extinguish with water – a fire extinguisher rated for Class O (oxygen) fires is the only thing to use, and even then, you should only use it if it’s safe to do so. We’ve had clients who tried to fight a liquid oxygen fire with water, which made it worse by spreading the oxygen-rich fuel.
Third, keep an incident log. Every near-miss, small leak, and incident should be logged, reviewed in weekly safety meetings, and used to update your protocols. Near-misses are not failures; they’re warnings. If a valve started leaking last month, even if it was fixed, make sure you add that valve to your monthly inspection list. The best ASU operators don’t just run the unit – they learn from every event, no matter how small.
At the end of the day, operating an ASU safely comes down to one thing: respect. Respect for the cold, high-pressure, reactive materials that make ASUs work, and respect for the people who work around them. We don’t just sell ASUs – we sell peace of mind, and we back that up with 24/7 support, training resources, and customized safety upgrades for every unit we supply.

If you’re looking for a new ASU, upgrading your current system, or need safety training for your operators, our team has decades of experience helping companies run their units safely and efficiently. We don’t just build equipment; we build partnerships, and we’re ready to help you navigate every step of ASU operation, from startup to emergency response. Reach out to our team to schedule a consultation and learn how we can support your safety goals.
Liquefaction Storage Equipment References
- OSHA Safety and Health Standards for Air Separation Units, 29 CFR 1910.101 and 1910.146
- Cryogenic Safety Guidelines, International Institute of Refrigeration, 2021
- Industrial Gas Safety Manual, Compressed Gas Association, 2020
- Best Practices for Air Separation Unit Operation, American Society of Mechanical Engineers, 2019
Xinxiang Jiale Intelligent Equipment Co., Ltd.
As one of the leading type of air separation unit manufacturers and suppliers in China, we also support customized service. Please feel free to buy high quality type of air separation unit for sale here from our factory. Contact us for more details.
Address: No.3913, 9th Floor, Unit 3, East Commercial and Office Complex, Baolong City Plaza, Hongqi District, Xinxiang City, Henan Province, China
E-mail: 1308567849@qq.com
WebSite: https://www.jialeasu.com/